G+2 Independent House – Miyapur
← Back to ProjectsConstruction

G+2 Independent House – Miyapur

Miyapur, Hyderabad 2025 3,125 sq.ft

Project Overview

Built end-to-end by Propifo's site team in Miyapur — this 3125 sq.ft project moved from foundation to keys in under a year. Soil bearing capacity was confirmed at 18 t/m², footings were stepped to suit the slope, and the entire RCC frame was independently audited.

Design Philosophy

"Future-proof shell — column grid sized for an additional floor, ducting routed for solar + EV from day one."

Materials & Brands

  • M30 RMC concrete (UltraTech) with cube-tested every pour
  • Fe 550D TMT bars (Tata Tiscon / JSW Neo)
  • Wienerberger fly-ash bricks for external walls
  • Havells geysers, fans and modular switches
  • Polycab FRLS wiring with MCB-RCCB protection
  • Dr. Fixit waterproofing on terrace, sunken slabs and bathrooms

Construction Journey

Captured on-site at every milestone — foundation footings, structural frame and the finished handover.

G+2 Independent House – Miyapur – 3D RenderStage 1

3D Render

Pre-construction 3D visualisation approved by the client — façade, massing and material palette locked in.

G+2 Independent House – Miyapur – Under ConstructionStage 2

Under Construction

RCC columns and slabs cast, brick masonry walls coming up, MEP routing in progress on-site.

G+2 Independent House – Miyapur – HandoverStage 3

Handover

Painted facade, finished interiors, landscaping and final quality handover to the client.

Project Highlights

  • Earthquake-resistant detailing per IS 1893 & IS 13920
  • Snag-free handover with 90-day defect liability cover
  • Independent MEP shop drawings before any conduit was laid
  • Liaisoning, GHMC sanction and occupancy certificate handled
  • 5-year structural warranty in writing
  • Rainwater harvesting pit + solar-ready conduits