← Back to ProjectsConstruction
Stilt + 3 Rental Building – Uppal
Uppal, Hyderabad 2026 6,400 sq.ft Stilt + 3 Prime Plus package
Project Overview
Three floors of 2BHK rental flats over stilt parking on a narrow 40-foot plot. The concrete frame is complete up to the terrace; brickwork starts next.
Design Philosophy
"Practical, low-maintenance flats that rent quickly and are easy to look after."
Materials Used
- Fe 550D TMT steel
- M25 ready-mix concrete
- Red clay brick walls (next stage)
- UPVC windows
- Stainless-steel balcony railings
- Rolling-shutter stilt gate
Construction Journey
The same site, photographed from the same spot at every stage. Tap a stage to see how the building came up.
2 of 4 stages done
Stage 2 · RCC FrameOct 2026Columns, beams and slabs cast floor by floor. Level, cover and curing checked before props are removed.
- Upcoming
3. Brickwork & Plaster
- Upcoming
4. Handover
Project Highlights
- Soil test before footing design
- Neighbouring walls protected during excavation
- Live progress photos shared with the owner
- Payments released only after each stage is verified