Triplex Bungalow – Financial District
Project Overview
Propifo executed this triplex bungalow in Financial District on a 3325 sq.ft plot — start to handover in 11 months. Our in-house RCC team, MEP coordinator and PMC engineer ran daily site checks, weekly client reports and a 56-point QC checklist before each pour.
Design Philosophy
"Future-proof shell — column grid sized for an additional floor, ducting routed for solar + EV from day one."
Materials & Brands
- Fenesta UPVC sliding windows with mosquito mesh
- Finolex CPVC plumbing with concealed routing
- Havells geysers, fans and modular switches
- Burma teak main door with brass hardware
- Fe 550D TMT bars (Tata Tiscon / JSW Neo)
- Kalinga vitrified tiles (800x1600) in living areas
Construction Journey
Captured on-site at every milestone — foundation footings, structural frame and the finished handover.
Stage 13D Render
Pre-construction 3D visualisation approved by the client — façade, massing and material palette locked in.
Stage 2Under Construction
RCC columns and slabs cast, brick masonry walls coming up, MEP routing in progress on-site.
Stage 3Handover
Painted facade, finished interiors, landscaping and final quality handover to the client.
Project Highlights
- Third-party concrete cube testing for every slab
- Snag-free handover with 90-day defect liability cover
- 5-year structural warranty in writing
- Anti-termite & double-coat waterproofing
- Independent MEP shop drawings before any conduit was laid
- Single point of contact — your Propifo project manager