Stilt + 4 Apartments – Miyapur
Miyapur, Hyderabad 2026 9,800 sq.ft Stilt + 4 Signature package
Project Overview
An eight-flat apartment block with a lift and stilt parking. The RCC frame is now complete up to the terrace; brickwork starts next.
Design Philosophy
"Good-sized balconies and cross-ventilated flats on every floor."
Materials Used
- Fe 550D TMT steel
- M30 concrete raft and columns
- Red clay brick walls (next stage)
- Lift shaft in RCC
- Aluminium sliding windows
- Steel-and-glass railings
Construction Journey
The same site, photographed from the same spot at every stage. Tap a stage to see how the building came up.
2 of 4 stages done
Stage 2 · RCC FrameOct 2026Columns, beams and slabs cast floor by floor. Level, cover and curing checked before props are removed.
- Upcoming
3. Brickwork & Plaster
- Upcoming
4. Handover
Project Highlights
- Raft foundation after soil investigation
- Lift shaft cast with the frame
- Live progress photos shared with every buyer
- Payments released only after each stage is verified